Building 46 Mold Remediation
Contract No. : SP4703-23-P-0041
Client. : Defense Logistics Agency (DLA, Richmond)
Year of Accomplishment:
October, 2023
Client. : Defense Logistics Agency (DLA, Richmond)
Year of Accomplishment:
October, 2023
Deck Replacement Visitor Assistance Center
Contract No. : W912PM23P0047
Client. : U.S ARMY CORPS OF ENGINEERS, (USACE)
Year of Accomplishment: September, 2023
Client. : U.S ARMY CORPS OF ENGINEERS, (USACE)
Year of Accomplishment: September, 2023
Supply and Delivery of Pre-cast Concrete Slabs, FT BELVOIR
Contract No. : W911S224P0097
Client. : MICC FORT DRUM
Year of Accomplishment: January, 2024
Client. : MICC FORT DRUM
Year of Accomplishment: January, 2024

Defense Supply Center Richmond (DSCR) Building 60C Wall Repair
Contract No. : SP4703-23-P-0030
Client. : Defense Logistics Agency (DLA, Richmond)
Year of Accomplishment: August, 2023 Duration: 90 Days
Client. : Defense Logistics Agency (DLA, Richmond)
Year of Accomplishment: August, 2023 Duration: 90 Days

Roof Repair at Bluestone Dam
Contract No. : W9123723P0030
Client. : USACE, Huntington District
Year of Accomplishment: August, 2023 Duration: 60 Days
Client. : USACE, Huntington District
Year of Accomplishment: August, 2023 Duration: 60 Days

Floor Replacement Visitor Assistance Center
Contract No. : W912PM23P0048
Client. : U.S ARMY CORPS OF ENGINEERS, (USACE)
Year of Accomplishment: September, 2023
Client. : U.S ARMY CORPS OF ENGINEERS, (USACE)
Year of Accomplishment: September, 2023

Supply and Delivery of Pre-cast Concrete Slabs
Contract No. : W911S223P0183
Client. : MICC FORT DRUM
Year of Accomplishment: March, 2023
Client. : MICC FORT DRUM
Year of Accomplishment: March, 2023

USCG Aspen Chill Water piping insulation at Curtis Bay, MD 21226
Contract No. : 70Z04023P60033Y00
Client. : United States Coast Guard
Year : March, 2023
Client. : United States Coast Guard
Year : March, 2023
Roof Replacement at Philpott Visitors Assistance center, Basset, Virginia
Contract No. : W912PM23P0029
Client. : U.S. Army Corps of Engineers, Wilmington.
Year : May, 2023
Client. : U.S. Army Corps of Engineers, Wilmington.
Year : May, 2023
North Kabul Afghanistan International Airport, JAF I Hangar
Contract No. : W5J9JE-16-C-0019
Client. : USACE – ACI
Year: ongoing
Client. : USACE – ACI
Year: ongoing
ANA Pole Chakhi 2nd BDE#2, Kabul - Afghanistan
Contract No. : W5J9JE-11-C-0090
Client. : USACE – Ebtakar Road & Building Construction Company
Year : 2016
Client. : USACE – Ebtakar Road & Building Construction Company
Year : 2016
ANA - NKAIA JAF III A-29/C-208 Hangar, Kabul
Contract No. : W5J9JE-15-C-0012
Client. : USACE – Assist Consultant Inc.
Year : 2016
Client. : USACE – Assist Consultant Inc.
Year : 2016
ANA South Kabul International Airport (SKAIA) Utilities Upgrade, Kabul - Afghanistan
Contract No. : W5J9JE-15-C-0002
Client. : USACE – ACI
Year : 2016
Client. : USACE – ACI
Year : 2016
OQAB Force Protection Upgrades ( T-walls around the campus)
Contract No.:W56SGK-14-C-8013
Client.: Regional Contracting Office-Capital
Year : 2014
Client.: Regional Contracting Office-Capital
Year : 2014
OQAB Force Protection Improvements.
Contract No.:W56SGK-13-C-8006
Client. : Regional Contracting Office – Capital
Year: 2014
Client. : Regional Contracting Office – Capital
Year: 2014
Supply of Construction Materials to ANCOP Jalalabad, Afghanistan.
Contract No. : W56JSL-12-P-0773
Client. : PHOENIX REGIONAL CONTRACTING CENTER
Year of Accomplishment : 2013
Year of Accomplishment : 2013
Chain Link Fence and Sniper screen for the entire FOB OQAB
Contract No. : W56SGK-13- C-7003
Client. : REGIONAL CONTRACTING CENTER-CAPITAL
Year : 2013
Year : 2013
Supply and Delivery of Construction Materials for Kandahar Air Base
Contract No. : W56JSL-12-P-0229
Client. : PHOENIX REGIONAL CONTRACTING CENTER
Year of Accomplishment : 2013
Year of Accomplishment : 2013
Air Compressed System for Air Craft Hangar
Contract No. : W56JSL-12-P-0568
Client. : PHOENIX REGIONAL CONTRACTING CENTER
Year of Accomplishment : 2013
Year of Accomplishment : 2013
Supply of Construction Materials to SPTC Wardak, Maidan Shahr District.
Contract No. : W56JSL-12-P-0753
Client. : PHOENIX REGIONAL CONTRACTING CENTER
Year of Accomplishment : 2013
Year of Accomplishment : 2013
Supply and Delivery of Construction Materials for Dashte Top
Contract No. : W56JSL-12-P-0209
Client. : PHOENIX REGIONAL CONTRACTING CENTER
Year of Accomplishment : 2013
Year of Accomplishment : 2013
Supply and Delivery of Construction Materials for OQAB upgrade
Contract No. : W56JSL-12-P-0202
Client. : PHOENIX REGIONAL CONTRACTING CENTER
Year of Accomplishment : 2013
Year of Accomplishment : 2013
Upgrading Communication System and Network in FOB OQAB, Kabul International Airport, Kabul – Afghanistan
Contract No. : W91B4M-12-C-6526
Client. : USG, KRCC, Camp Eggers
Year: 2013
Client. : USG, KRCC, Camp Eggers
Year: 2013
Construction Materials Supplies
Contract No. : W56JSL-12-P-1387
Client. : USG, KRCC, Camp Eggers
Year : 2013
Client. : USG, KRCC, Camp Eggers
Year : 2013
Blanket Purchase Agreement (BPA) – Force Protection
Contract No. : W91B4M-11-A-0019
Client. : USG, KRCC, Camp Eggers
Year: 2013
Client. : USG, KRCC, Camp Eggers
Year: 2013
Logistic Branch School, Kabul - Afghanistan
Contract No. : W5J9JE-11-C-0030
Client. : USACE – KCC
Year : 2013
Year : 2013
Design and Installation of Windows in FOB OQAB
Contract No. : W56JSL-12-P-0145
Client. : PHOENIX REGIONAL CONTRACTING CENTER
Year of Accomplishment : 2012
Year of Accomplishment : 2012
Design and Installation of Windows in FOB OQAB
Contract No. : W56JSL-12-P-0145
Client. : PHOENIX REGIONAL CONTRACTING CENTER
Year of Accomplishment : 2012
Year of Accomplishment : 2012
Force Protection Upgrade, FOB OQAB
Contract No. : W91JA4-12-C-7148
Client. : PHOENIX RCC
Year: 2012
Client. : PHOENIX RCC
Year: 2012
Renovation of US Air Force 438 AEW HQ Building
Contract No. : W91B4M-12-C-6515
Client. : US Government, Kabul Regional Contracting Center, Camp Eggers
Year of Accomplishment : 2012
Year of Accomplishment : 2012
Design and Construction of Chain-link Fence around Aerial Port Facility located in NKAIA.
Contract No. :W91B4M-11-C-6644
Client. : US Government, Kabul Regional Contracting Center, Camp Eggers
Year : 2012
Client. : US Government, Kabul Regional Contracting Center, Camp Eggers
Year : 2012
Replacing Doors and Windows in NATO AIR Training
Contract No. : W91B4M-11-C-6646
Client. : USG, KRCC, Camp Eggers
Year: 2012
Client. : USG, KRCC, Camp Eggers
Year: 2012
Force Protection Upgrade, FOB OQAB, Kabul International Airport, Kabul - Afghanistan
Contract No. : W91B4M-11-P-0174
Client. : USG, KRCC, Camp Eggers
Year : 2012
Year : 2012
Secondary Spill Containment Pads at KMTC, Kabul - Afghanistan
Contract No. : . W5J9JE-10-C-0009
Client. : US Army Corps of Engineers
Year: 2012
Client. : US Army Corps of Engineers
Year: 2012
CERP - Construction of Paymonar Road, Kabul
Contract No. : W5J9JE-11-C-0033
Client. : USACE – Taj Loyal Construction Company
Year : 2012
Client. : USACE – Taj Loyal Construction Company
Year : 2012
SECURITY UPGRADES FOR NAVC FACILITY AT PAKTIYA
Contract No. : USACE – PBI
Client. : W5J9JE-10-D-0028 TASK ORDER 0005
Year: 2011
Client. : W5J9JE-10-D-0028 TASK ORDER 0005
Year: 2011
ANA O&M SECURITY UPGRADES TO GARDEZ
Contract No. : W5J9JE-10-D-0028 TASK ORDER 0003
Client. : USACE – PBI
Year : 2011
Client. : USACE – PBI
Year : 2011
Design and Construction of ANA Garrison Upgrades, Pole-Charkhi and Darulaman, Kabul-Afghanistan
Contract No. : W917PM-07-D-0020-0011
Client. : USACE – KRIMA Construction Corporation
Year : 2011
Client. : USACE – KRIMA Construction Corporation
Year : 2011
ANA 22 Arms Storage Bunkers at Pule Charkhi, Kabul - Afghanistan
Contract No. : W917PM-07-D-0020 Task Order No. 0007
Client. : USACE – KRIMA Construction Corporation
Year : 2011
Client. : USACE – KRIMA Construction Corporation
Year : 2011
KABUL INTERNATIONAL AIRPORT STAFF SECURITY BUILDING
Contract No. : W5J9JE-10-P-0034
Client. : US ARMY CORPS OF ENGINEERS
Year:2010
Client. : US ARMY CORPS OF ENGINEERS
Year:2010
SECURITY UPGRADE OF KABUL INTERNATIONAL AIRPORT
Contract No. : W917PM-08-C-0084
Client. : US ARMY CORPS OF ENGINEERS
Year:2010
Client. : US ARMY CORPS OF ENGINEERS
Year:2010
RADAR PADS AT KABUL INTERNATIONAL AIRPORT
Contract No. : W917PM-09-C-0032
Client. : US ARMY CORPS OF ENGINEERS
Year. : 2009
Client. : US ARMY CORPS OF ENGINEERS
Year. : 2009
Design Projects
A | E DESIGN PROJECT - SNP (PROJECT 35AR)
Location : KABUL AFGHANISTAN.
Contract No. : S6100000862 Year:JAN 29, 2020
Service Type : Design
Contract No. : S6100000862 Year:JAN 29, 2020
Service Type : Design
A | E DESIGN PROJECT - SNP (PROJECT 35AR)
Location : KABUL AFGHANISTAN.
Contract No. : S6100000878
Year: 2020
Service Type : Design
Contract No. : S6100000878
Year: 2020
Service Type : Design
DESIGN-BUILD FOR - MOBILITY SCHOOL OF EXCELLENCE
Location : KABUL, AFGHANISTAN.
Contract No. : W5J9JE18F0078
Year: SEP 2020
Service Type : Design
Contract No. : W5J9JE18F0078
Year: SEP 2020
Service Type : Design
HOSPITAL MEDICAL AWARENESS TRAINING FACILITY PROJECT # 35AN
Location : KABUL AFGHANISTAN.
Contract No. : S610000811 Year:JAN 29, 2020
Service Type : Design
Contract No. : S610000811 Year:JAN 29, 2020
Service Type : Design
BAMYAN PRISON INDUSTRY BUILDING AND SECURITY UPGRADE, PROJECT 6B
Location : BAMYAN AFGHANISTAN.
Contract No. : S610000779
Year: 2020
Service Type : Design
Contract No. : S610000779
Year: 2020
Service Type : Design
REPAIR & RENOVATE ECP 1 & 2, KNMH,KABUL,AFGHANISTAN
Location : KABUL, AFGHANISTAN.
Contract No. : KM-MCB-W-0050-1396
Year: SEP 2019
Service Type : Design
Contract No. : KM-MCB-W-0050-1396
Year: SEP 2019
Service Type : Design
KABUL NATIONAL MILITARY HOSPITAL KNMH-VMS
Location : KABUL AFGHANISTAN.
Contract No. : W5J9JE-17-D-0005 Year:JAN 29, 2019
Service Type : Design
Contract No. : W5J9JE-17-D-0005 Year:JAN 29, 2019
Service Type : Design
CONSTRUCTION OF 13TH STREET OF WAZIR AKBAR KHAN ROAD NO.3
Location : KABUL AFGHANISTAN.
Contract No. : KM-SW-NCB-0054-1396
Year: 2019
Service Type : Design
Contract No. : KM-SW-NCB-0054-1396
Year: 2019
Service Type : Design
CONSTRUCTION OF PARK-E-SHARID SABZ IN KHAIR KHAN MENA KABUL AFGHANISTAN
Location : KABUL, AFGHANISTAN.
Contract No. : KM-MCB-W-0050-1396
Year: SEP 2019
Service Type : Design
Contract No. : KM-MCB-W-0050-1396
Year: SEP 2019
Service Type : Design
CONSTRUCTION OF 80 KENNELS IN DARULAMAN, KABUL AFGHANISTAN
Location : KABUL AFGHANISTAN.
Contract No. : MAH/AFG/MAY-2019/001 Year:JAN 29, 2019
Service Type : Design
Contract No. : MAH/AFG/MAY-2019/001 Year:JAN 29, 2019
Service Type : Design
ANA-18-061SMW HKIA STRUCTURE SUPPORT KABUL PROVINCE, AFGHANISTAN
Location : KABUL AFGHANISTAN.
Contract No. : W5J9JE-17-D-0005- W5J9JE18F0081
Year: 2018
Service Type : Design
Contract No. : W5J9JE-17-D-0005- W5J9JE18F0081
Year: 2018
Service Type : Design
ANP TACC AIR JAF-I DEMOLATION & NEW STRUCTURE, KABUL AFGHANISTAN
Location : KABUL, AFGHANISTAN.
Contract No. : W5J9JE-16-C-0019
Year: SEP 2018
Service Type : Design
Contract No. : W5J9JE-16-C-0019
Year: SEP 2018
Service Type : Design
ANA WOWEN\'S PARTICIPATION PROGRAM-NHKIA, KABUL AFGHANISTAN
Location : KABUL AFGHANISTAN.
Contract No. : W5J9JE-17-C-001 Year:JAN 29, 2017
Service Type : Design
Contract No. : W5J9JE-17-C-001 Year:JAN 29, 2017
Service Type : Design
ANP WPP CONST, PANJSHIR PHQ PANJSHIR AFGHANISTAN
Location : KABUL AFGHANISTAN.
Contract No. : W5J9JE-16-C-0027
Year: 2017
Service Type : Design
Contract No. : W5J9JE-16-C-0027
Year: 2017
Service Type : Design
BATTALION COMPANY HAEDQUARTERS
Location : DOR BABA DISTRICT NANGARHAR PROVINCE, AFGHANISTAN.
Contract No. : W5J9LE-12-C-0126
Year: SEP 2016
Service Type : Design-Geotechnical Investigation-Survey
Contract No. : W5J9LE-12-C-0126
Year: SEP 2016
Service Type : Design-Geotechnical Investigation-Survey
AFGHAN NATIONAL POLICE (ANP) UP DISTRICT HEADQUARTERS SHINKAY DISTRICT
Location : ZABUL PROVINCE, AFGHANISTAN.
Contract No. : W5J9LE-12-C-0069 Year:JAN 29, 2013
Service Type : Survey – Geotechnical Investigation Design
Contract No. : W5J9LE-12-C-0069 Year:JAN 29, 2013
Service Type : Survey – Geotechnical Investigation Design
MINISTRY OF THE INTERIOR SUPPLY POINT
Location : FARAH PROVINCE, AFGHANISTAN.
Contract No. : W5J9LE-12-C-0038
Year: JULY 11, 2012
Service Type : Design
Contract No. : W5J9LE-12-C-0038
Year: JULY 11, 2012
Service Type : Design
ANP PROVINCIAL RESPONSE COMPANY (PRC)
Location : SHARANA DISTRICT, PAKTIKA PROVINCE, AFGHANISTAN
Contract No. : W5J9LE-12-C-0104
Year: SEP 23, 2012
Service Type : Design
Contract No. : W5J9LE-12-C-0104
Year: SEP 23, 2012
Service Type : Design
AFGHANISTAN NATIONAL BORDER POLICE (ANBP) BORDER POLICE COMPANY HEADQUARTERS
Location : CHAH-I-AB DISTRICT, TAKHAR PROVINCE, AFGHANISTAN.
Contract No. : W5J9LE-11-C-0078
Year:JULY 02, 2011
Service Type : Design and Survey
Contract No. : W5J9LE-11-C-0078
Year:JULY 02, 2011
Service Type : Design and Survey
SHINDAND DISTRICT HOSPITAL COMPLEX
Location : HERAT PROVINCE, AFGHANISTAN.
Contract No. : W5J9LE-11-C-0059
Year:DEC 24, 2011
Service Type : Design and Survey
Contract No. : W5J9LE-11-C-0059
Year:DEC 24, 2011
Service Type : Design and Survey
AFGHANISTAN NATIONAL POLICE (ANP) UNIFORMED POLICE DISTRICT HEADQUARTERS
Location : TANAI, KHOST PROVINCE, AFGHANISTAN.
Contract No. : W5J9LE-10-C-0036
Year:JAN 23, 2011
Service Type : Design and Survey
Contract No. : W5J9LE-10-C-0036
Year:JAN 23, 2011
Service Type : Design and Survey
ANP 1-STORY DISTRICT HQ RAGHISTAN DISTRICT HQ
Location : BADAKHSHAN, AFGHANISTAN.
Contract No. : W917PM-07-D-0020
Year: MAR 17, 2010
Service Type : Survey- Geotechnical Investigation Design
Contract No. : W917PM-07-D-0020
Year: MAR 17, 2010
Service Type : Survey- Geotechnical Investigation Design
ANP UP PROVINCE HEADQUARTERS POL-E-ALAM UP PROVINCE HQs
Location : POL-E-ALAM UP PROVINCIAL LOAGAR PROVINCE, AFGHANISTAN.
Contract No. : W917PM-09-C-0073
Year:JAN 20, 2010
Service Type : Design and Survey
Contract No. : W917PM-09-C-0073
Year:JAN 20, 2010
Service Type : Design and Survey
IMPROVEMENT OF 22 BUNKERS INSTALLITION
Location : POL-E-CHARKHI KABUL, AFGHANISTAN.
Contract No. : W917PM-07-D-0020-T.O#0007
Year: APR – 2010
Service Type : Design-Geotechnical. Investigation- Survey- Construction
Contract No. : W917PM-07-D-0020-T.O#0007
Year: APR – 2010
Service Type : Design-Geotechnical. Investigation- Survey- Construction
ANA CORPS SUPPORT BATTALION CAMP SHAHEEN.
Location : MAZAR-E-SHARIF, GARRISON, AFGHANISTAN.
Contract No. : W917PM09-C-0081
Year: APR, 17, 2010
Service Type : Survey and Design
Contract No. : W917PM09-C-0081
Year: APR, 17, 2010
Service Type : Survey and Design
AFGHANISTAN NATIONAL POLICE (ANP) UNIFORMED POLICE DISTRICT HEADQUARTERS FACILITIES.
Location : DEH SABZ, KABUL PROVINCE, AFGHANISTAN.
Contract No. : W5J9LE-10-C-0027
Year:JUNE 08, 2010
Service Type : Survey and Design
Contract No. : W5J9LE-10-C-0027
Year:JUNE 08, 2010
Service Type : Survey and Design
CHEMTALLAH AMMO BUNKERS
Location : KABUL PROVINCE, AFGHANISTAN
Contract No. : W5J9LE-10-C-0061
Year:NOV, 23, 2010
Service Type : Design and Survey
Contract No. : W5J9LE-10-C-0061
Year:NOV, 23, 2010
Service Type : Design and Survey
AFGHANISTAN NATIONAL POLICE (ANP) UNIFORMED POLICE DISTRICT HEADQUARTERS
Location : LASHKARGAH, HELMAND PROVINCE, AFGHANISTAN.
Contract No. : W917PM-09-C-0094
Year:JAN 31, 2010
Service Type : Survey and Design
Contract No. : W917PM-09-C-0094
Year:JAN 31, 2010
Service Type : Survey and Design
AFGHAN NATIONAL BORDER POLICE UNIT FACILITY
Location : KUNAR AFGHANISTAN.
Contract No. : W917PM-09-C-0043
Year:OCT 13, 2006
Service Type : Geotechnical Investigation Survey – Design
Contract No. : W917PM-09-C-0043
Year:OCT 13, 2006
Service Type : Geotechnical Investigation Survey – Design